The installer's side
Every job, lead to switched on
Every job from lead to switched on, with a clock on each stage. A stage that runs past its limit is flagged, so the long utility wait gets chased instead of guessed at.
Rocha Orchards · Farm · 240 kWUtility approval · 68 days (limit 45)
Kings River Packing · Business · 410 kWInstall · 6 days
Delgado home · Home · 8.2 kWUtility approval · 23 days
Sanger Tire & Auto · Business · 62 kWPermit · 1 days
Hernandez Ranch · Farm · 120 kWProposal · 8 days (limit 5)
Patel home · Home · 6.4 kWSite survey · 3 days
A fictional installer. Sample jobs, reps and numbers. Nothing on this page is stored, sent or filed.
Texts, WhatsApp, email and photos
Every message, one place
3 messages in today, each sorted into the solar jobs it belongs to. 3 need a person.
Keep your number
Customers text the same number they always have, and their texts stay blue. There's no new number to hand out.
Personal stays personal
Family and friends are skipped, and chit-chat never creates work.
- Dad: “Come by the shop Sunday, bring the kids” · family, skipped
- Delgado home: “Love seeing the app turn green, thanks!” · chit-chat, no work
Sample data. Every name, number and message here is made up.
Records, documents and signatures
Paperwork that files and signs itself
A place for everything, and everything in its place.
Everyone who writes to you gets a record on their first message. Every document lands on the right record. Signatures go out on their own through the e-signature tool you already use, after a short hold you can stop. You watch it work; you don't have to do it.
3 installs on record, 3 still waiting on a document. 3 things done automatically today, each with an Undo.
240 kW ground mount · wells 1 and 2
Install for Rocha Orchards · $468,000
- Proposal
- Contract signed
- Permit
- Installed
- Inspected
- Utility permission
- Switched on
- Install contract · Signed by both · May 1
- Building permit · Issued online · May 8
- Interconnection application · Sent to the utility · Aug 19
- Final inspection sign-off · Photo from the inspector's card · Aug 26
- Permission to operate · not in yet
E-signature: Install contract signed by Rocha Orchards and filed on this install.
120 kW ground mount · well 3 and shop
Install for Hernandez Ranch · $238,000
- Proposal
- Contract signed
- Permit
- Installed
- Inspected
- Utility permission
- Switched on
- Proposal · Checked and sent · Oct 28
- Install contract · not in yet
- Utility bills, last 12 months · Uploaded by Hernandez Ranch · Oct 22
E-signature: Install contract goes to Hernandez Ranch in 20 seconds. Stop it, or let it go.
62 kW roof · shop and showroom
Install for Sanger Tire & Auto · $131,000
- Proposal
- Contract signed
- Permit
- Installed
- Inspected
- Utility permission
- Switched on
- Install contract · Signed by both · Oct 9
- Building permit · Issued online · Oct 30
- Battery change order · not in yet
E-signature: Battery change order is waiting: No email on their record yet.
Sample data. Every name, number and document here is made up, and nothing is sent.